“This was a fast track design project that skipped over the 35% design right to the 65% in order to get the projected designed in time to be awarded on schedule. The follow on construction project needed to be awarded timely in order to not delay another construction project that needed the utilities required by this project. Triple C went above and beyond to make sure the design stayed on track and in spite of several issues that were outside the control of the designer, they kept the project on track.”