Dena Hallaran, CS, Long Beach VAHCS

QUALITY: “This AE performance is deemed exceptional due to the rushed circumstances of the AE design portion. Due to the nature of the USP 797 /800 regulations, and the time in which the standards came into effect, the AE design time frame was considerably shortened in order to get the construction portion of the project funded. Additionally, the AE used advanced photographic technologies to map out the existing above the ceiling utilities to provide an up to date model of the existing utility conditions above the ceiling.”