Posted on June 4, 2017 by Stephen - Uncategorized
- Assistance with Contractor Selection
- Submittal Review
- Respond to Requests for Information
- Owner Architect Contractor Meetings
- Special Inspections
- Site Observation Reports
- Operation & Maintenance Manual Review
- Project Closeout
Posted on June 4, 2017 by Stephen - Uncategorized
- Medical Equipment Planning
- Design of Medical Facilities
- PACT Design
- Phased Planning
- Space Planning
- Public Health Facilities
- Update, Modify and Create New Standards
- Validation of Clinical Program Workloads
Posted on June 4, 2017 by Stephen - Uncategorized
- Seismic Upgrades
- Building Expansions, Renovations and Additions
- Site Analysis
- Construction Sequencing
- Value Engineering
- Stormwater Assessments
- Utility Infrastructure Expansion
- Surveying Medical Facilities for Deficiencies
Posted on June 4, 2017 by Stephen - Uncategorized
- Construction Documentation
- Drainage Analysis
- Specifications
- Earthwork Calculations
- 3D Modeling
- Site Utility Calculations
Posted on June 4, 2017 by Stephen - Uncategorized
- Site Survey of Mechanical, Plumbing, Medical Gas, and Fire Protection Systems
- Facility Assessments
- Energy Modeling
- Life Cycle Cost Analysis
- Building Energy Code Compliance
- Utility Rebates
- Building Automation Systems & Controls
- Central Plant and Equipment Optimization
- LEED Design
- Construction Documentation
- Specifications
- Construction Administration
Posted on June 4, 2017 by Stephen - Uncategorized
“Schedule, cost control, and management are exceptional. Triple C is an exceptional to have design a project.” COR, Albuquerque NMVAHCS
- Structural Design for New Buildings
- Modernizations, Renovations and Building Additions
- Seismic Analysis and Retrofit Design
- Wind Tunnel Testing
- Deep, Shallow, and Expansive Soil Foundation Design
- Site Structures and Facility Amenities
- Forensic Investigations and Building Inspections
- Sustainable Design
- Border Patrol Tunnel Mitigation
- Façade Engineering
Posted on June 4, 2017 by Stephen - Uncategorized
“Products have been neat, complete in every detail, and well organized.”
- Programming
- Architectural Space Planning
- Furniture Space Planning
- Construction Documentation
- Finish Selection / Specification
- Furniture Selection / Specification
- Millwork Design
- 3D Modeling / Renderings
Posted on June 4, 2017 by Stephen - Uncategorized
“Triple C has shown a high level of quality in the projects we have awarded to them.”
- Programming
- Site Survey
- Space Planning
- Construction Documentation
- Specifications
- Signage
- Construction Administration
- Master Planning
- 3D Modeling/Renderings
Recent Comments