The Chiller Infrastructure system required updating, upsizing, and corrections. Triple C developed a design to increase the size of the chilled water piping system to increase the distribution capacity for the main hospital. The design also included the installation of two additional chillers in the chiller plant to increase the chilled water capacity for the campus. Triple C is designing also designed an Overhead Pedestrian Canopy to provide ease of access and maintenance of the unseen raceway and utility lines.

The design provides for the connection of the medical oxygen and vacuum pump control lines and alarm control panels.  The additional chiller units were designed within the existing infrastructure of Building 22A and connect to the existing chiller infrastructure. The design included the installation of automated controls for chilled water system components which are tied into the site-wide Metasys (Johnson Controls) computer based operating system centralized in the boiler plant.