The Chiller Infrastructure system requires updating, upsizing, and corrections. Triple C is developing a design to increase the size of the chilled water piping system to increase the distribution capacity for the main hospital. The design also includes the installation of two additional chillers in the chiller plant to increase the chilled water capacity for the campus. Triple C is designing an Overhead Pedestrian Canopy to provide ease of access and maintenance of the unseen raceway and utility lines.
The design provides for the connection of the medical oxygen and vacuum pump control lines and alarm control panels.  The additional chiller units are designed within the existing infrastructure of Building 22A and will connect to the existing chiller infrastructure. The design includes the installation of automated controls for chilled water system components which shall be tied into the site-wide Metasys (Johnson Controls) computer based operating system centralized in the boiler plant.