This project removes and replaces three 500 BHP, high pressure steam boilers, associated equipment to include the DA tank, condensate tank and flash tank located in the central energy plant. In addition, all ancillary piping systems, controls, pumps valves and other devices will be replaced with state of the art equipment and materials with the intention of providing the highest levels of reliability and efficiency

New boilers are sized to meet the requirement for existing and planned loads so that the plant runs as efficiently as possible. Boilers, DA tank and condensate tank safety devices will adhere to standards for safety device testing established by the VA and detailed in the Technical Information Library specifications and Boiler Plant Safety Device Testing Manual (third edition).